Bridgeview Childcare Centre Tenant Improvement
City of Surrey · Surrey, BC · Completed
- Role
- General Contractor
- Client
- City of Surrey
- Location
- Surrey, BC
- Floor area
- Approx. 10,000 sq. ft.
- Schedule
- Dec 2024 – Dec 2025
- Status
- Completed
Project overview
A tenant improvement and community centre renovation for the City of Surrey at 11475 126A Street, delivered by Hilson Construction as general contractor. Part of the existing Bridgeview community centre was transformed into a licensed daycare for 48 children, from infants through age five, while the centre’s gym and commercial kitchen stayed in place. The contract value was approximately $1.2 million.
The need
The City of Surrey needed approximately 10,000 sq. ft. of an existing community centre converted into a Métis Family Services (MFS) licensed daycare, with dedicated classrooms, washrooms, kitchenettes and nap rooms sized for 48 children. The renovation also had to deliver MFS staff and office areas, a point-of-sale office for the community centre and new gender-neutral and universal washrooms, and it had to add new electrical and mechanical systems that improve energy performance and meet applicable ASHRAE requirements. Throughout, the community centre’s gym and commercial kitchen had to keep functioning.
Scope of work
- Existing-condition assessment and demolition
- Site preparation and trade mobilization
- Steel and wood framing
- Gypsum board walls, ceilings and bulkheads
- T-bar ceiling systems and ceiling tiles
- Flooring, millwork, painting and finishing
- Doors, aluminum and glazing
- Roofing work
- Plumbing and washroom construction
- Mechanical / HVAC systems
- Electrical, lighting, low-voltage and controls
- Fire and life-safety coordination
- Classroom kitchenettes, nap rooms and specialized childcare spaces
- Testing, inspections, commissioning and closeout documentation
Spaces delivered
- Licensed daycare for 48 children
- Infant-to-age-five classrooms
- Nap rooms
- Classroom kitchenettes
- Childcare washrooms
- MFS staff & office areas
- Point-of-sale office
- Gender-neutral & universal washrooms
- New mechanical & electrical systems
- 01 Mobilization Kick-off, site preparation and deployment of trades along City-designated access routes.
- 02 Rough-in & framing Initial electrical, mechanical and plumbing work, then steel and wood framing and drywall.
- 03 Inspections & ceilings Rough-in inspections, then T-bar ceiling systems and bulkheads.
- 04 Finishes Flooring, millwork, painting, doors, aluminum and glazing.
- 05 Commissioning Final MEP work, air balancing, cleaning and the substantial performance walkthrough.
What made it demanding
The work took place inside an existing community centre, so new construction had to be integrated with existing building conditions while the gym and commercial kitchen stayed in use. Another contractor worked at the same time on the adjacent outdoor play area on the southeast side of the building. The City designated construction access routes for workers and deliveries, and existing entrances, exits, sidewalks, parking and delivery areas had to stay clear. Phasing had to limit disruption to normal facility operations and vehicle movement, and all work had to comply with City of Surrey bylaws and noise restrictions, with any work outside permitted hours needing prior approval.
How Hilson delivered
Hilson’s approach centred on detailed trade coordination, phased construction and active site management. The project schedule integrated the major construction activities so that electrical, mechanical, plumbing, framing, drywall, finishes and commissioning were coordinated from start to finish. Hilson worked alongside the City of Surrey, the project consultant, other contractors on site and outside agencies. Site logistics were managed through designated access, controlled material deliveries and the required traffic controls. Hilson provided continuous supervision of its skilled workers and subcontractors and kept overall responsibility for the work.
What was delivered
The completed project gives the community centre a new MFS licensed daycare for 48 children, with dedicated classrooms, washrooms, kitchenettes and nap rooms, alongside MFS staff and office space, a community centre point-of-sale office, gender-neutral and universal washrooms, and new electrical, mechanical, plumbing, lighting and low-voltage systems. For municipalities, school boards and childcare operators, it shows Hilson delivering a complex, multi-trade tenant improvement inside an existing community facility while that facility’s other spaces keep working.
Site photos
Frequently asked questions
Has Hilson Construction built a daycare or childcare centre?
Yes. Hilson Construction was the general contractor for the Bridgeview Childcare Centre in Surrey, BC, an approximately 10,000 sq. ft. tenant improvement for the City of Surrey that created a licensed daycare for 48 children, from infants through age five.
Can Hilson renovate part of a community centre while the rest stays open?
Yes. At Bridgeview, the community centre’s gym and commercial kitchen stayed in place while Hilson built the new childcare facility. Work followed City-designated access routes, and entrances, exits, sidewalks, parking and delivery areas were kept clear.
Has Hilson worked for the City of Surrey?
Yes. Hilson delivered the Bridgeview Childcare Centre tenant improvement at 11475 126A Street under a City of Surrey construction contract worth approximately $1.2 million, with construction running from December 2024 to December 2025.
What was included in the Bridgeview Childcare Centre project?
Childcare classrooms, washrooms, kitchenettes and nap rooms; MFS staff and office areas; a community centre point-of-sale office; gender-neutral and universal washrooms; and new mechanical, electrical, plumbing, lighting and low-voltage systems, through to testing, commissioning and closeout.